Lemington, Utah

Fuller awarded Western Refractory a contract to complete the same scope of work as the Dakota Cement project, with the exception that a complete calciner was installed pre shutdown on a new structure.  The refractory construction was completed using brick where possible, castable was installed below stage 2, and gunite above stage 2.  A total of 1859.76 t of refractory was installed.